Projects

Restoration and Renovation of the Forest Town Hall

Restoration and Renovation of the Forest Town Hall

HCF_1260x580

Building/site

Type

Public

Location

Rue du Curé, 1190 Forest

Style

Art Déco

Year of construction

1935-1938

Original design

Jean-Baptiste Dewin

Mission

Client

Municipality of Forest

Project team

Origin Architecture & Engineering, MK Engineering (techniques spéciales), Delta GC (fire engineering)

Contractor

Galère, Dejeond&Delarge (vitraux)

Start

2004

Completion

In progress

The restoration and renovation mission of the Forest Town Hall began in 2004 and involves the restoration of the exterior envelope as well as the already affected interior spaces, namely the basements, the ground floor, and the first floor. In 2015, the Municipality of Forest decided to extend the mission of ORIGIN Architecture & Engineering to include the study of the attic layout. This option to develop the attic is also linked to the Municipality's ambition to restructure its municipal services, optimize, and streamline its operations.

Taking into account the potential of the Town Hall (location, flexibility, capacity for expansion, prestige of the building, etc.), the Municipality of Forest sought to strengthen the central status of the Town Hall as the administrative hub of the municipality.

© Georges De Kinder_500x750_6

The project focuses on specific aspects such as deep restoration interventions on the one hand, concerning the exterior envelope: the façades, flat roofs, surroundings, exterior lighting, metal joinery, stained glass windows, wrought ironwork, the tower, the translation booth, and on the other hand, the interior of the building: wooden joinery, wrought ironwork, paintings, marble, etc. There are also interventions more akin to heavy renovation, such as bringing the building into compliance with fire safety regulations, accessibility for people with reduced mobility, and technical equipment (ventilation, data systems, etc.). The requirements and requests from the Municipality of Forest have thus evolved significantly over the past fifteen years and are currently being realized.

© Georges De Kinder_620x413_4
© Georges De Kinder_500x750_2
© Georges De Kinder_500x750_9
© Georges De Kinder_500x750_7
© Georges De Kinder_620x413_2
© Georges De Kinder_620x413_3

Team members

9003_20260126_MAI

Cécile Mairy

Administrator

Education
Architectural Engineer and DES in "Etude et gestion du Patrimoine Culturel" (FUNDP-UCL-ULB-Ulg)

9003_20230525_ASM_325x410

Anne-Sophie Mahaux

Collaborator

Education
Architectural Engineer and Master "Conservation et restauration du patrimoine culturel immobilier" (UCL)

9003_20230417_JLA_325x410

Julie Lambillon

Collaborator

Education
Architect and Master "Urbanisme et Aménagement du territoire / Patrimoine" (IUAT/ULB)

abu

Aurore Burette

Collaborator

Education
Architect and "Executive Master en Patrimoine Architectural" (ULB-VUB)

CyprienHaustrate

Cyprien Haustrate

Previous collaborator

image

Emil Maxwell

Trainee

Education
Architect

Contact us

Please do not hesitate to contact us. Someone from the Origin team will be happy to answer your questions.

Contact

Related projects